MS08-Experimental apparatus for testing combined bending and twisting deformation
MS08-Experimental apparatus for testing combined bending and twisting deformation
MS08-Experimental apparatus for testing combined bending and twisting deformation
MS08-Experimental apparatus for testing combined bending and twisting deformation
MS08-Experimental apparatus for testing combined bending and twisting deformation
MS08-Experimental apparatus for testing combined bending and twisting deformation

MS08-Experimental apparatus for testing combined bending and twisting deformation

The MS08 bending torsion combined deformation testing experimental device is the core equipment used in material mechanics experiments to study the mechanical behavior of components under the combined action of bending moment M and torsional moment T.

Share:

Added to cart successfully

Product Introduction

The MS08 bending torsion combined deformation testing experimental device is the core equipment used in material mechanics experiments to study the mechanical behavior of components under the combined action of bending moment M and torsional moment T.

Specially designed for actively applying controllable bending moments and torques to simulate complex working conditions such as transmission shafts, crankshafts, and cantilever beams subjected to lateral forces commonly found in engineering. Its core objective is to validate the strength theory (especially the third and fourth strength theories) and determine the principalstress.

Experimental feature

1

Analysis of combined bending and twisting stress state

2

Determination of principal stress and principal direction

3

Verification of the relationship between internal force diagram and external force

Product Attributes

Product Model

MS08

Product Name

Experimental apparatus for testing combined bending

and twisting deformation

Main Materials

Carbon steel,

aluminum

Specifications

≤1000×400×1000mm

Product Weight

10kg

Operating Environment

Room temperature, relative

humidity  85%

Input Power Supply

None

Required Modules

None

Optional Modules

None

FAQ

Is your company a manufacturer or a trading company?

We are a direct source manufacturer with independent R&D, production and quality inspection workshops, and have years of expertise in the university laboratory equipment sector.

What payment methods are supported for overseas orders?

We accept T/T (Telegraphic Transfer) and irrevocable sight L/C (Letter of Credit). Formal commercial or proforma invoices are issued for all orders, with a transparent and traceable process.

What is the production and delivery cycle for the equipment?

Standard models: 45-60 days. Expedited production is available for urgent orders with priority scheduling, and the exact lead time is negotiable.

Do you support product customization?

Customization, OEM and ODM services are available. We can adjust parameters, structure, size and functions as required, and accept private labeling production.

How do you ensure the safe transport of the equipment?

Export-grade triple shockproof and moisture-proof packaging (shockproof foam + thickened carton + plywood wooden case) with warning labels attached. 

Does the product come with a warranty? Are spare parts included?

All products come with a 2-year free original factory warranty, and common wearing parts are provided free of charge during the warranty period.
Overseas After-Sales Support:
• 7×24h remote technical support and free operation training with one-on-one engineer guidance;
• Free urgent air shipment of replacement parts for non-human-induced quality defects within the warranty period;
• Lifetime technical consultation and cost-price spare parts supply after warranty;
• Bilingual manuals, operation videos and experiment guides are included for easy use by beginners.

How do you control product quality before shipment?

Strict three-level quality inspection is carried out before delivery:
1. Raw Material Inspection: Full inspection of core components to control precision;
2. In-Process Inspection: Special personnel monitor each process to avoid defects;
3. Final Shipment Inspection: Power-on testing and precision calibration, with official inspection reports issued; factory inspection and remote inspection are both supported.

Case Studies

In 2026, a new batch of compressed air energy storage teaching experimental equipment was successfully delivered, empowering universities with micro-newton technology for new energy teaching

In 2026, a new batch of compressed air energy storage teaching experimental equipment was successfully delivered, empowering universities with micro-newton technology for new energy teaching

01

In 2026, a new batch of compressed air energy storage teaching experimental equipment was successfully delivered, empowering universities with micro-newton technology for new energy teaching

Micro Newton (Shandong) Technology Development Co., Ltd. successfully completed the delivery of the first batch of new energy teaching experimental equipment in 2026.

Learn More

Related Products

1.769461s